Louie is a qualified professional with over 20 years of relevant experience, specific to the role under consideration. He has previously been certified as competent to Commission new and altered ATRICS installations by the Chief Engineer and is an expert in conceptual and practical technical aspects of Control Systems installation, combined with significant Project Management skills and experience in a signalling and train control environment.
• Project and Design Management from concept through to planning, design, implementation, testing and commissioning.
• Stakeholder management.
• System software and hardware validation testing.
• Providing post commissioning technical support for maintenance and trouble-shooting of control systems.
• Development and delivery of technical training packages for maintenance personnel and operator users.
• Knowledge of ETCS concepts, design and application rules, testing and commissioning procedures.

 

EXPERIENCE

  • Rail Services Australia
    ATRICS Systems Integration and Commissioning Manager – Sydney Trains 2013 – Present
    Coordinate the integration of ATRICS design and testing activities in line with overall project delivery requirements. Lead a team of project managers in the delivery of Control Systems projects to ensure they meet the agreed scope of works in a financially responsible manner within a safe working environment in compliance with Sydney Trains reliability and quality requirements.
    Manage the investigation, analysis and authorisation of the design, implementation, testing and the delivery of correction of second and third level Control Systems failures and defects, providing Engineering Design and Commissioning Authority.
  • Aurecon – Sydney
    Project Design Manager – Novo Rail 2010 – 2013
    Management of the Systems Design deliverables for the LGCUP Stages 9 to 11 as part of the Resignalling and Auburn Maintenance Facility Entry/Exit modifications. Manage the Trackside interface design deliverables for RailCorp’s the first ETCS Level 1 implementation in Australia. This included the successful design strategy and proposal for the ATP Trackside Enabling works on Main North.
    Successfully managed the delivery of the first ETCS Level 1 Trackside Design Circuit books and signal plans interfacing to RailCorp’s Relay and SSI based interlocking’s and delivered the Track, OHW and 1
    Signal design packages for the construction stages aligning with Possessions and ultimately achieving the Commissioning milestone as planned for the Waratah PPP project.
  • Ansaldo STS – Project Manager 2008 – 2009
    Managed the signal design deliverables consisting of signal plan, TIP and AFC/Testing phases of circuit books. Planned and negotiated with RailCorp the re-commencement of our subcontractor site construction works due to RailCorp deliverables delays with minimal cost to both parties
    Provided a complete ATP project definition detailing scope, schedule, cost estimates, resourcing levels an
    Identifying key opportunities and risks over other competitors.
  • RailCorp – ATP Project Engineer, Communications and Control Systems 2007 – 2008
    Successfully managed the planning, approvals, installation, testing and commissioning of the Siemens’ Train Guard ETCS for both trackside and on-train. As role of Test Captain, successfully completed the evaluation test cases of Siemens fitted out test train proving functionality and interoperability across the all three supplier’s track sites.
    Successfully transferred the ETCS principles and benefits of an ATP implementation to various RailCorp and external rolling stock stakeholders during the trial evaluation period. Was a key member of the Collaborative Development Group in developing the ATP principles and network rules for a future roll-out across the RailCorp network. Reported to the Project Manager to ensure deadlines are met during test execution and solutions to problems are delivered in accordance with scheduled project plans.
  • Project Manager, Communications and Control Systems 2001 – 2006
    Project managed the rollout of the Metropolitan Signal Control System (MSCS) project based on the Advanced Train Running Information & Control System (ATRICS). The formulation of a commissioning strategy for new control systems that would ensure a seamless transfer of operations across to the new system. This included the I/O correspondence site testing phase interfacing to the existing signalling system without affecting on-going train running operations.
    Successfully completed the development and rollout of signalling control systems into various ‘dark’ areas of the NSW metropolitan rail network as a result of the Glenbrook Rail Accident Inquiry. As a key member of the Sydenham Control Centre Project team, implemented the consolidation of the remote control of the signalling infrastructure of Sydney’s Illawarra and South metropolitan rail regions Sydney Connect
  • Bachelor of Engineering (Electrical) – University of Technology, Sydney, 1992
    Graduate Certificate in Engineering Management (Partial) – University of Technology, Sydney, 2002
    Practical TCP/IP and Ethernet Networking; Practical Lightning and Surge Protection; 1994 Practical SCADA and Telemetry Systems for Industry; Practical Programmable Logic Controllers (PLCs)